Urban Planning and Development Applications of GIS
Sponsored by the Geographic Information Systems Subcommittee of the Urban Planning and Development Division of ASCE. This report provides the most...

Environmental Technology Verification Report for Ammonia Recovery Process
Prepared by the Environmental Technology Evaluation Center (EvTEC), a CERF Service Center. This report describes the nature and scope of an environmental...

Solid Ground
The densely populated island nation of Singapore has no choice but to be creative in devising strategies for disposing of solid waste. With its tiny land mass and the fact that its single...

Desert Wetlands
Two constructed wetlands demonstration projects in the Imperial Valley of California are being designed to help improve the water quality of the New River, which originates in Mexico and...

On the Question of Accepting Work Outside One's Field of Expertise: An Ethical Fail Safe
The winner of the Daniel W. Mead Prize for ethical writing by a student discusses the history of the development of ASCE's code of ethics. Although it may be legal for civil...

Drip/Micro Irrigation
Drip/micro irrigation (also previously referred to as trickle irrigation) refers to a variety of irrigation methods in which water is delivered directly to small areas adjacent to individual...

Remediation Lessons Learned
Within the past few years a large number of environmental remediation projects have been completed that are now in postclosure monitoring. What lessons can be learned from these projects?...

A Risk-Based Approach to Subsurface NORM Disposal
(No paper) Naturally occurring radioactive materials (NORM) has become an environmental concern for the petroleum industry. NORM scales results when naturally occurring radium co-precipitates...

Risk-Based Corrective Measures for Waste Management Facility Closure
(No paper) In the past several years, risked-based corrective measure has been gradually accepted by federal and state agencies as a standard practice for site remediation or site closure....

Progress and Future Direction to Improve Arizona's Reclaimed Wastewater Reuse Program
(No paper) The Arizona Department of Environmental Quality (ADEQ) is undertaking a major revision of its reclaimed wastewater reuse program in response to recommendations made by a citizens...

Environmental Engineering '99
This proceedings, Environmental Engineering 1999, contains summaries of papers presented at the 1999 National Conference on Environmental Engineering...

Who Provides Inspection
With the increasing interest in the design-build project deliver system, the decision of who should be responsible for quality assurance/quality control has become a complex one. To assist...

Conquering the Mountain
Interstate 26 will be the largest and most expensive highway project ever undertaken in North Carolina. When completed in 2002, I-26 will provide safe and efficient interstate passage...

The Ultimate Challenge
The U.S. Department of Energy (DOE) has spent $2 billion and more than a decade studying the feasibility of constructing a nuclear waste repository inside Yucca Mountain in Nevada. The...

Rebuilding Bosnia
A civil engineer serving in the U.S. Army Reserve on deployment in Bosnia-Herzegovina gives a first-hand account of construction in a war-torn country. As a member of the Environmental...

Deep Diagnosis (available only in Geoenvironmental Special Issue)
Contaminated sediments in the world's waterways present a variety of problems, both economic and environmental. The two basic problems are waterways which need maintenance...

Future Fire Codes
Performance-based fire codes are a trend worldwide. The idea is to get away from prescriptive, cook-book codes that dictate design. Performance based codes should be more rational and...

Nothing Wasted
Anoxic gas flotation (AGF), a patented system for anaerobic digestion of organic slurry waste, can recover as much as 85% of the phosphorus and 23% of the nitrogen in slurry waste, while...

Stretching a Landfill
Landfill expansions can pose engineering challenges, and the Tullytown, Pa., landfill gives an example of a horizontal expansion that added 121 acres of future disposal space. The side-by-side...

Preparing for Pier A
Earthquakes, oil wells, contamination and unstable soil were among the challenges engineers faced as they prepared a site at California's port of Long Beach for the Pier A...

 

 

 

 

Return to search